Deliverables and publications

Deliver-able Deliverable name WP no Lead   Type   Date
D1.1 State of the art report WP1 NAGRA R PU M6
D1.2 D1.2 Final workshop final WP1 NAGRA OTH PU M60
D1.3 D1.3 Final assessment report WP1 NAGRA R PU M60
D2.1 Workshop to present and discuss relevant national and international extant information relating to bentonite mechanical evolution. WP2 RWM, SKB, LEI OTH PU M1
D2.2 Report on identification of relevant data/models, improvement of understanding of main processes associated to bentonite component evolution taking into account possible heterogeneities.

EXCEL DATABASE

WP2 Quintessa/ RWM R PU M6
D2.3 Report on captured knowledge

Appendix B is the database available from the menu above.

WP2 Quintessa/ RWM R PU M54
D3.1 Description of the constitutive models available at the start of the project. Conceptual bases, mathematical description and model capabilities and shortcomings. WP3 UPC R PU M9
D3.2 Description of improved constitutive models and their implementation and verification. WP3 UPC R PU M27
D3.3 Description of the constitutive models developed in the project. Conceptual bases, mathematical description and model capabilities. Assessment of predictive power. WP3 UPC R PU M44
D4.1 (merged with earlier D4.2) Bentonite mechanical evolution – experimental work for the support of model development and validation WP4 GRS R PU M27
D4.2 Creep in bentonite – a natural analogue study WP4 SKB R PU M36
D4.3 Experimental work on buffer evolution in the frame of BEACON – final report of WP4 WP4 GRS R PU M47
D5.1.1 Specifications of verification/validation test cases – geometry, characteristics of the materials, measures WP5 Andra R M12
D5.1.2 Synthesis of the results obtain of test cases from task 5.1 WP5 Andra R M24
D5.2.1 Specifications of large scale experiments tests from task 5.2 WP5 Andra R M18
D5.2.2 Synthesis of the results obtain of test cases from task 5.2 WP5 Andra R
D.5.3.1 Specifications of predictive test cases from task 5.3 WP5 Andra R M30
D.5.3.2 Synthesis of the results obtained from test cases from task 5.3 WP5 ULg R M42
D.5.6

 

D5.7

D5.6 TESTING, VERIFICATION AND VALIDATION OF MODELS

 

D5.7 Synthesis of the results obtained from all tasks in WP5

WP5

 

WP5

Andra

 

Andra

R

 

R

M52

 

 

D6.1 Scoping of the Beacon project, initial CS perspectives and enhanced work plan for years 2-4

WP6 MKG R PU
D6.2 CS perspectives with a focus on verification and validation of models, and comparing models with situations close to disposal conditions (task 5.1 and 5.2 of WP5) WP6 MKG R PU
D6.3 D6.3 Beacon A summary for civil society

WP6 MKG R PU M27
D6.4 D6.4 CS broader participation at the final workshop

WP6 MKG R PU M39
D7.1 Website for public and partner use

www.beacon-h2020.eu

WP7 SKB DEC PU M3
D7.2 Project presentation. Nature, scope, activities and expected results of the project WP7 SKB OTH PU M3
D7.3 Plan for the Exploitation and Dissemination of Results (PEDR). WP7 SKB OTH PU M6
D7.4 Publication plan (Publication of articles in scientific journals) WP7 SKB OTH RE M4
D7.5 Training Course WP7 UPC/ SKB OTH PU M6
D7.6 D7.6 Proceedings from the final workshop WP7 SKB R PU M60
D7.7

 

D7.8

D7.7 Prep&publ project summary

 

D7.8 Full project report that includes the synthesis report from the WP1-6

WP7 SKB R PU M58
D8.1 Data Management Plan (DMP) WP8 SKB OTH M6
D8.2 Communication plan WP8 SKB OTH M6
D8.3 Minutes from Kick off meeting WP8 SKB OTH M4
D8.4 Minutes from first annual meeting WP8 SKB OTH M13
D8.5 Minutes from second annual meeting WP8 SKB OTH M25
D8.6 Minutes from third annual meeting WP8 SKB OTH M37
D8.7 D8.7_Minutes Beacon 4th Annual Meeting 2021 WP8 SKB OTH M46
D8.8 EARB first annual project review WP8 SKB R PU M12
D8.9 EARB second annual project review report WP8 SKB R PU M24
D8.10 EARB third annual project review report

D8.10 EARB-review-third annual meeting_inc response

WP8 SKB R PU M36
D8.11

D8.15

D8.11_Fourth_EARB_Annual_Project_Review

D8.15 EARB fifth annual project review

WP8 SKB R PU M46

M60

D8.12 Proceedings from Initial Workshop WP8 SKB R PU M4
D8.13 The first EARB review at project start WP8 SKB R PU M4
D9.1 EPQ – Requirement No. 1 WP9 SKB Ethics Con